Gain Immediate access to our Essays
FREE access exchanged for your work, or pay £4.99
Words: 1,215 | Submitted: Sat Dec 15 2007
... flooding in Lewes started at about 1.00pm, as the rising river backed up behind the Cliffe Bridge and overtopped the flood defences at a number of locations. Within about an hour or so the flood defences throughout the town were completely overwhelmed and the town centre rapidly filled with floodwater. Many hundreds of people were stranded and had to be rescued by the Emergency Services in boats. By the time the floodwaters peaked at about 9.30pm, some parts of Lewes were less than 3.6m of water. As the flows passing downstream from Barcombe continued to increase at a rapid rate, the floodwaters weired over the river walls and surged through the streets and open areas in Lewes, rapidly filling up sections of the urban floodplain to a depth of 1m in about half an hour. The Police abandoned the centre of town, and the evacuation turned into a rescue operation as ...
FREE access exchanged for your work, or pay £4.99